Italy’s recovery plan, town by town: €91.6 billion mapped, half of it paid
Italy’s EU-funded recovery plan, the PNRR, has placed €91.6 billion of projects in individual comuni, and 7,893 of the country’s 7,896 towns have at least one. In the project data downloaded on 31 October 2026, 51.9% of that money is recorded as paid. The median comune has €892 of projects per resident. That is just under half of the €194.4 billion plan. The rest pays for regional, national and shared projects that can’t be pinned to one town.
What the number is, and what it isn’t
A comune’s figure is the money for projects located there, whoever runs them: the town council, a school, a health authority, a university or a private company. It is not money the town hall received.
- Shared projects are split evenly.A project listed in several comuni counts an equal share in each, so a town’s figure is an approximate upper bound on what is spent locally.
- Wider-area projects are left out.Money assigned to a province, a region or the whole country isn’t attributed to any one town, though towns may still benefit from it.
- “Paid” means payments recorded against each projectin the open data. It is not the government’s official spending figure: its monitoring system reported €124.9 billion spent across the whole plan by 1 July 2026, about 64%. The two measure different things, so 51.9%is a snapshot of the project records, not the plan’s spending rate.
Three comuni have no project tied to them in the data.
The South got its 40%, but less of it is paid
Swipe sideways to see the whole chart →
Source: OpenPNRR / Italia Domani projects tied to comuni, downloaded 31 October 2026, summed by region; ISTAT population. “Paid” is over the projects with usable payment records.
The South and islands have 33% of Italy’s residents and 40.5% of the money tied to comuni. That matches the plan’s rule that at least 40% of the resources that can be assigned to a territory go to the Mezzogiorno. Less of it has been paid, though: 43% in the South against 58% in the Centre-North, with Sicilia lowest at 38% and Veneto highest at 66%.
Big cities lead, mid-size towns trail
Swipe sideways to see the whole chart →
Size = ISTAT residents. Source: OpenPNRR / Italia Domani, ISTAT.
The big cities have €2,434 of projects per resident, against €1,099 in towns of 5,000–19,999people. They carry the plan’s largest single items: metro and tram lines, electric buses and rail nodes. The smallest villages come second, lifted by the pilot-village grants below, and they have paid the largest share of their money (59%, against 49% in the big cities).
Where the money goes
Swipe sideways to see the whole chart →
Source: OpenPNRR sector of each project. Not shown: justice (€37,464).
Schools are the bulk of it: nurseries, school canteens and safety upgrades, plus university and research centres. The money is lumpy. Infrastructure and health projects sit in a minority of towns, while digitalisation, a small item, reaches 7,888 comuni: almost every town hall got something for its website or online services.
The tiny villages at the top
The four comuni with the most PNRR money per resident are all villages of 306people or fewer. Each was chosen as a regional pilot of the plan’s “Attrattività dei borghi” scheme, which gave 21 villages about €20 million each to revive them. Elva, in Piemonte, has 80 residents and €20.7 million of projects: about €258,409 per person.
| Town | Residents | PNRR projects | Per resident | Paid |
|---|---|---|---|---|
| ElvaPiemonte | 80 | €20.7M | €258,409 | 55% |
| CalascioAbruzzo | 119 | €20.1M | €169,322 | 7% |
| Palù del FersinaTrentino-Alto Adige | 173 | €20.2M | €116,494 | 24% |
| Castel del GiudiceMolise | 306 | €30.0M | €97,917 | 36% |
| Pertica AltaLombardia | 549 | €19.1M | €34,738 | 28% |
| ArvierValle d'Aosta | 819 | €20.1M | €24,602 | 24% |
| StelvioTrentino-Alto Adige | 1,179 | €21.1M | €17,880 | 40% |
| UlassaiSardegna | 1,365 | €20.6M | €15,100 | 53% |
| GeraceCalabria | 2,275 | €33.4M | €14,696 | 53% |
| AccadiaPuglia | 2,204 | €27.0M | €12,236 | 25% |
| Montalto delle MarcheMarche | 1,814 | €21.4M | €11,821 | 33% |
| SanzaCampania | 2,313 | €24.4M | €10,550 | 36% |
| VizziniSicilia | 5,636 | €46.7M | €8,293 | 45% |
| Grizzana MorandiEmilia-Romagna | 3,947 | €23.7M | €6,013 | 66% |
| AcquapendenteLazio | 5,222 | €27.0M | €5,162 | 58% |
| AndoraLiguria | 7,255 | €31.8M | €4,383 | 47% |
| Recoaro TermeVeneto | 5,767 | €23.6M | €4,097 | 48% |
| CavrigliaToscana | 9,504 | €30.3M | €3,186 | 52% |
| Rionero in VultureBasilicata | 12,325 | €33.0M | €2,677 | 42% |
| GoriziaFriuli-Venezia Giulia | 33,679 | €53.2M | €1,580 | 71% |
| TerniUmbria | 106,272 | €133.3M | €1,255 | 57% |
13 of the 21 pilot comuni have fewer than 5,000 residents; the largest is Terni, with 106,272. The pilots are paying out slowly: their median is 45% paid, against 65% for comuni overall. Calascio has 7% of its projects recorded as paid.
A town’s figure includes all its PNRR projects, not only the pilot grant. Several pilot villages are frazioni; the table shows the comune that holds the grant.
When one project is the whole story
Among towns of 1,000 people or more, Ciminna tops the per-resident list with €171.1 million, about €51,548 for each of its 3,319 residents. Ciminna and Villasor each carry €166.7 million as their share of a high-voltage power link between the mainland, Sicily and Sardinia. It is a national grid project, not town spending: listed in several comuni, it is split evenly between them, and none of it is recorded as paid yet.
Other large figures in small towns are also one big project, often slow:
- Colobraro (Basilicata, 1,014 residents): €35.4 million for a waste-disposal plant, 0% paid.
- Mazzarrà Sant'Andrea (Sicilia, 1,405 residents): €32.3 million for making safe and closing a disused landfill, 1% paid.
- Camporotondo Etneo (Sicilia, 5,208 residents): €117.6 million for the Circumetnea metro line, 30% paid.
| Town | Residents | PNRR projects | Per resident | Paid |
|---|---|---|---|---|
| CiminnaSicilia | 3,319 | €171.1M | €51,548 | 2% |
| ColobraroBasilicata | 1,014 | €35.8M | €35,348 | 1% |
| VillasorSardegna | 6,480 | €168.5M | €26,004 | 1% |
| Mazzarrà Sant'AndreaSicilia | 1,405 | €34.0M | €24,199 | 5% |
| Camporotondo EtneoSicilia | 5,208 | €125.0M | €24,007 | 30% |
| Guardia LombardiCampania | 1,446 | €26.9M | €18,605 | 41% |
| Sant'Albano SturaPiemonte | 2,420 | €44.8M | €18,518 | 48% |
| StelvioTrentino-Alto Adige | 1,179 | €21.1M | €17,880 | 40% |
| MongrassanoCalabria | 1,446 | €25.2M | €17,437 | 31% |
| SalaraVeneto | 1,027 | €16.9M | €16,476 | 64% |
The ten comuni of 1,000 or more residents with the most PNRR money per resident. Smaller towns are left out of this ranking, because one project can swing a tiny town.
The same pattern explains the slowest big cities. Bari has 31.7% paid, and its largest project, €458.7 million for the city’s rail node, has none recorded. Catania (34.1%) has €514.9 million for burying the railway at the central station, at 0%. Bologna, by contrast, has 67.5% paid, helped by €398.8 million for its first tram line at 94%.
| Town | Residents | PNRR projects | Per resident | Paid |
|---|---|---|---|---|
| RomaLazio | 2,745,062 | €5.6bn | €2,047 | 44% |
| MilanoLombardia | 1,362,863 | €3.1bn | €2,263 | 54% |
| NapoliCampania | 905,050 | €2.6bn | €2,925 | 45% |
| GenovaLiguria | 566,247 | €1.9bn | €3,319 | 45% |
| BariPuglia | 316,248 | €1.8bn | €5,664 | 32% |
| BolognaEmilia-Romagna | 391,473 | €1.7bn | €4,456 | 68% |
| TorinoPiemonte | 855,654 | €1.7bn | €2,037 | 58% |
| CataniaSicilia | 296,984 | €1.6bn | €5,315 | 34% |
| PalermoSicilia | 626,273 | €1.1bn | €1,722 | 42% |
| VeneziaVeneto | 249,385 | €998.0M | €4,002 | 52% |
The ten comuni with the most PNRR money in total.
Who has paid the most, and why it can mislead
Most of the money sits with comuni that are between a quarter and three quarters paid. The 2,753 comuni at 75% or more hold only €7.6 billion.
| Share paid | Comuni | PNRR projects |
|---|---|---|
| Under 25% | 332 | €4.1bn |
| 25–50% | 1,803 | €39.8bn |
| 50–75% | 3,005 | €40.0bn |
| 75% and over | 2,753 | €7.6bn |
Among the 2,341 comuni with at least €5 million of projects, the ten closest to fully paid are all in the north, led by Costa Serina (Lombardia), at 99.9% after €5.2 million for a school upgrade. Sevenof the ten list “Transizione 5.0” tax credits to local firms among their three largest items, and the data shows those credits as fully paid. A high paid share can mean a town that delivered on time, or one whose largest items are business tax credits rather than public works.
How we counted
- Data. Every PNRR project localised in a comune, from OpenPNRR by Openpolis (ODbL) and Italia Domani (CC-BY 4.0), downloaded on 31 October 2026. The same data feeds the PNRR panel on each Borgo Data town page.
- Amounts. A project listed in several comuni is split evenly between them. Projects assigned only to a province, region or the country are not counted. In all, 334,221 project entries across 7,893 comuni.
- Paid.Payments recorded against each project divided by its PNRR allocation. Where a project’s recorded payments exceed its allocation, that project is left out of the paid share, as on the town pages.
- Per resident.Each comune’s ISTAT population. The ranking per resident includes only towns of 1,000 or more; the pilot villages are shown at any size.
- South. The eight regions counted by the PNRR’s 40% rule for the Mezzogiorno: Abruzzo, Molise, Campania, Puglia, Basilicata, Calabria, Sicilia and Sardegna.
Sources
- OpenPNRR (Openpolis) and Italia Domani, projects by comune, downloaded 31 October 2026
- Ministry of Culture, “Attrattività dei borghi”, Linea A: the 21 pilot villages
- Lavori Pubblici, PNRR monitoring at 1 July 2026 (plan total and spending)
- Camera dei deputati, the Mezzogiorno in the PNRR (the 40% rule)